Local Property News | Posted by Hnin Ei Khin
The Bago River Bridge No. 3 has been set for six years for implementation from 2017 to 2022, according to the Ministry of Construction.
The Bago River Bridge is a 2013-meter long, four-lane Cable Steel Bridge that is being constructed with a JICA ODA Loan of 310.51 million Yen.
Deputy Minister of Construction Dr. Kyaw Lin inspected the construction of the Bago River Bridge No.3 under construction on February 8.
Written by iMyanmarHouse.com Team
Credit: iMyanmarHouse.com